February 19, 2008:  After a rain, the field is wet and muddy.  Note the piles of dirt in the center of the photo. 

img053
Workers are scooping up debris-- in this case, old trees and shrubs-- and putting it into the dumpster at the right. 

img054
Debris being put into a dumpster.

img055
A worker surveys the field.  They cannot take away too much soil. 

img056
The worker's profile gives one a sense of how big the mounds of topsoil are. 

img057
Meanwhile, down at the end of the field, other things are happening. 

img058
This water-filled trough gives one a sense of how much rainfall we've recently received. 

img059
A huge retaining wall is being constructed along the West perimiter. 

img 060
The capped rebar gives one a sense of how high the retaining wall will go. 

img061
A pipe is coming out of the ground. 

img062
Here's an old section of the old wall of the Eastern perimiter of the field. 

img063
The dark hill of topsoil has been recently made.  In all, workers will take up to two feet of soil from the field. 

img064
February 21, 2008:  Here's a panoramic view of the field. 

img065
Construction "honchos" discuss the progress of the project. 

img066
More scraping of the topsoil needs to be done. 

img067
A view of the project from just outside of the Gym.

img068
Sandbags mark the perimiter of the dig. 

img069
This end of the field just does not look the same without the old eucalyptus trees. 

img070
February 23, 2008:  Here's a panoramic shot of the project.  Notice how wet the field is from recent rains: more rain came the night these shots were taken. 

img071
The rain should take some time to soak down. 

img072
Tarp keeps some of the topsoil hills dry. 

img073
Another panoramic view of the project. 

img074
A view of a vertical pipe. 

img075
This is a view from the patio just outside of the President's office. 

img076
Soon, the debris and the hills of topsoil will be taken away. 