Gallery # 4

March 6, 2008: Drainage pipes are stacked up, waiting for installation.

More materials for the field.

These T-connectors will allow drainage pipes to be installed all througout the field.

Another view of the pipes.

Another type of piping that will be installed.

More piping awaits deployment.

Two feet of soil is needed to be taken away.

This part of the retaining wall is finished.

Detail of the base of the retaining wall.

This area will be filled up to the top of the wall. The fence posts are already installed.

One can get a sense of just how far down the retaining wall is going. The gazebo straight ahead is part of St. Bridget Parish's property.

Soon, the old weight room to the right will be demolished.

The ground will go up near the top of the wall to the left.

Downtown looms on the horizon. This view will be slightly obscured by the fence.

The wood will soon be taken away.

These wires now lead to nowhere.

Some of the earth has been taken away.

Rubble from the old fence still awaits removal. With the dry weather, the puddles are gone.