Track & Field Renovation

Gallery # 4

img077
March 6, 2008:  Drainage pipes are stacked up, waiting for installation. 

img078
More materials for the field. 

img079
These T-connectors will allow drainage pipes to be installed all througout the field. 

img080
Another view of the pipes. 

img081
Another type of piping that will be installed. 

img082
More piping awaits deployment. 

img083
Two feet of soil is needed to be taken away. 

img084
This part of the retaining wall is finished. 

img085
Detail of the base of the retaining wall. 

img086
This area will be filled up to the top of the wall.  The fence posts are already installed. 

img087
One can get a sense of just how far down the retaining wall is going.  The gazebo straight ahead is part of St. Bridget Parish's property. 

img088
Soon, the old weight room to the right will be demolished. 

img089
The ground will go up near the top of the wall to the left. 

img090
Downtown looms on the horizon.  This view will be slightly obscured by the fence. 

img091
The wood will soon be taken away. 

img092
These wires now lead to nowhere.

img093
Some of the earth has been taken away. 

img094
Rubble from the old fence still awaits removal.  With the dry weather, the puddles are gone. 