Track & Field Renovation

Gallery # 15 - April 25, 2008

img440
April 25, 2008:  The track has been paved; the far side of the field is being covered with a tarp.  Meanwhile, a layer of gravel has been spread over the tarp on the near side of the field. 

img441
This composite of five photographs show the newly-paved track, with the bleachers laid over the pavement between the track and the fence. 

img442
From the patio outside the gym, one gets a good view of the field, with the Downtown skyscrapers in the background. 

img443
Neat piles of brick wait for installation. 

img444
Brick walls are rising between the two posts nearest to us. 

img445
The pink and yellow string show where the brick walls will go. 

img446
A view from the ground shows the rebar where posts will be constructed. 

img447
Soon, the area between the new fence and the Senior Building will have more room for lunch lines and such. 

img448
This composite of five pictures show progress on the new walls being raised. 

img449
The surface of the track has a beautiful surface. 

img450
Much work has been done in just the past few weeks. 

img451
A view of the basketball courts.  Soon, they will be available, along with our brand new track and field!

img452
A pole rises above the newly-paved surface. 

img453
The same pole from a different perspective. 

img454
Soon, the uprooted underbrush will be taken away. 

img455
The gravel will soon be spread over the tarp. 

img456
This is what left of one of the PVC pipes that stuck out of the ground. 

img457
The track seems to go right into one of the apartment buildings. 

img458
Another post rises in a corner of the bleachers. 

img459
This corner of the campus is much cleaner. 

img460
The far end of the field, looking towards the apartments and St. Bridget's Parish Church. 

img461
Soon, a fence will block easy access to the swale. 

img461
Only a couple of weeks ago, the area of the blacktop went down more than 10 feet. 

img463
A worker bends some conduit at the far side of the field, next to the retaining wall. 

img464
Four pictures were stitched together to show a view from the Southwest corner of campus. 

img465
Five pictures were stitched together to show the track and field from another perspective. 

img466
A close-up of the track surface. 

img467
These beams await eventual installation.  Note the twin curbs, with the wood plank between them.  They form a drainage channel. 

img468
Yet another pole near the bleachers below the MHR Conference Room. 

img469
Soon, turf will grace the field. 

img470
Another view of the field. 

img471
These metal pieces will soon be installed. 

img472
The channel formed by the two curbs will have this durable plastic screen to make a level surface. 

img473
A close-up view of the channel between the two curbs.  Notice the notched corners where the screen will be placed. 

img474
Work continues on this structure. 

img475
Yet another concrete pole rises, this time alongside the curved wall. 

img476
This part of the gutter alongside Bishops Road is still covered. 

CHS Track and Field Renovation Homepage